Critical Path

Critical Path (1994)

by Mechadeus, Media Vision Technology
Genres:Adventure
Themes:Science fiction
Story:Critical Path is an interactive movie video game developed by Mechadeus for PC and Mac.
user avatarAdded by @victorchopin
60
Trailers and screenshots
Screenshot
Screenshot
Screenshot
Similar games on GOG
Stories about this game (0)
What’s your memory of Critical Path?Share your favorite moments and see what others remember about this game.
user avatar@placeholder

Make sure to follow our Guidelines when adding new Stories.

If not sure what to write:
  • What made this game unforgettable?
  • Who did you play this game with?
  • What made it fun or challenging?
  • Why do you want this game on GOG?
No stories yet! Be the first to share your memories with Critical Path and inspire others.
Those games also need your vote!
Freelancer
FreelancerEight hundred years prior to the start of our story, bitter conflict divided all of mankind. A handful of colonists struck out on their own to begin anew - far away from the Earth and its turmoil. Several ships were launched with enough equipment and supplies to give the hundreds onboard a fighting chance - but since the area around far-off Sirius had never been surveyed, no one really knew what to expect. What they found was a new frontier of free-flowing natural resources, unexplored territories, great wonders and lurking dangers. Each ship, representing the clusters of people and their earthly place of origin, settled into different parts of the galaxy pre-selected by their ship-board computer to give them the best chance of survival. Life was hard in the beginning, but over the 800 years the different colonies prospered and expanded their territories, claiming more and more systems for their own. Survival and propagation eventually led to growth and profit as each of the colonies developed specialties and fostered commerce. As the colonies grew and time passed their connections with their roots on Earth dwindled and they lost their memories of the conflicts of the past. Soon their attention was dominated by new, more immediate conflicts. Feelings of lost ancestral connection spurred anachronism in the look of the great cities, and created a somewhat distorted image of each colony's cultural heritage. In the ever-expanding outer edge of the territories, frontier lawlessness prevailed. The Houses: Each shipboard colony that left Earth carried some memory of its origins in its name. The Liberty carried Americans, The Bretonia flew from The United Kingdom and surrounding territory, The Kusari from Asia, and the Rheinland launched with Germanic cargo. As each ship settled and colonies began to expand, they knew little about each other and their advancing development. Finally, little by little, the individual colonies found each other and began to set up trade routes to link their systems for commerce and solidarity. Today, with each colony firmly rooted in its respective corner of the galaxy, the colonies rely heavily on each other for trade and industry but also compete for resources and new territories in the Border Worlds. The colonies mandate member governments in "The New Alliance" within the Sirius sector. To control conflicts, each colony has forged alliances and treaties with others as they have grown. Competition remains fierce, however. Struggles rage for supremacy in business, commerce, resources, power and control. There can be tenuous peace between colonies' political agendas, but the grabs for holdings constantly unsettle the volatile frontier.
Our Pick
Top
Science fiction
Sandbox
Our Pick
Top
Science fiction
Sandbox
104 568
1026
Silent Hill 2 (Classic)
Silent Hill 2 (Classic)The second entry in the Silent Hill franchise, Silent Hill 2 is a narrative-focused third-person psychological survival horror game with emphasis on combat, exploration and puzzle-solving elements which follows James Sunderland, a man who receives a letter, seemingly sent by his three-years-deceased wife Mary, in which he is beckoned to the fog-ridden town of Silent Hill at the same time as numerous other people troubled by their past.
Our Pick
Top
Horror
Survival
Mystery
Drama
Our Pick
Top
Horror
Survival
Mystery
Drama
103 643
306
Silent Hill
Silent HillSilent Hill is the first installment in the Silent Hill series of psychological survival horror video games. Unlike earlier survival horror games that focused on protagonists with combat training, the main character Harry Mason is an average man. The gameplay consists of combat, exploration, and puzzle-solving. The controller vibration is used to indicate Harry's heartbeat and will vibrate on low health. The player must regularly enter an inventory screen to check Harry's health, use items, and equip different weapons.
Our Pick
Top
Action
Horror
Survival
Our Pick
Top
Action
Horror
Survival
103 331
492
Black & White 2
Black & White 2In the game, the player takes the role of a god called from the void (nothingness) to help those who invoked them. However, the player is not an omnipotent style god, but rather a god who rises and falls with his believers and the player must help develop their nature according to their good or evil desires. The player also has a creature, their physical representation in the world, which takes the form of an anthropomorphic ape, lion, wolf, turtle, cow, or tiger. Its physical manifestation can grow to an immense size, and adopt a good or evil persona separate of the player's. They develop their character as the player rewards or punishes their actions. In addition to the god simulation and city-building elements introduced in the original Black & White, Black & White 2 also features elements of real-time strategy gameplay, with the addition of controllable warfare and fighting units.
Top
Action
Fantasy
Comedy
Sandbox
Top
Action
Fantasy
Comedy
Sandbox
94 186
148
Final Fantasy VII
Final Fantasy VIIFinal Fantasy VII is a role-playing game set in a post-modern, steampunk world where technology and fantasy elements coexist. Players control Cloud Strife, an ex-soldier who joins the eco-terrorist group AVALANCHE to oppose Shinra Inc., a corporation draining the planet's life energy. The game features turn-based combat with an active time element, a customizable Materia system for abilities, and unique Limit Break attacks for each character. Players explore 3D environments, engage in various mini-games, and uncover a complex plot involving Cloud's mysterious past and a powerful threat to the world. As the story progresses, players gain access to different vehicles, allowing them to explore new areas and uncover additional content.
Top
Fantasy
Science fiction
Top
Fantasy
Science fiction
90 256
160
Digimon World
Digimon WorldDigimon world is a game that allows a player to raise their own Digimon and teach it to battle.
Our Pick
Top
Fantasy
Science fiction
Our Pick
Top
Fantasy
Science fiction
86 757
1802
American McGee's Alice
American McGee's AliceShortly after her second adventure, Through the Looking-Glass, Alice's house is burnt down by an accidental fire, killing her family and leaving her as the only survivor. As time progresses Alice loses touch with reality. She is institutionalized in Rutledge Asylum, where she is observed and treated by Dr. Heironymous Wilson. Alice's only possession in Rutledge is a stuffed rabbit. Ten years after Alice was committed to Rutledge, she finds herself sucked back into a Wonderland that has been twisted by her own broken mind. The White Rabbit summons Alice to aid a radically altered Wonderland, which became a twisted version of itself as it came under the horrible rule of the Queen of Hearts. The Cheshire Cat serves as Alice's companion throughout the game, frequently appearing to guide her with cryptic comments.
Top
Action
Horror
Top
Action
Horror
68 251
133
Resident Evil Code: Veronica X
Resident Evil Code: Veronica XExperience another terrifying chapter in the Resident Evil series with Resident Evil: Code Veronica X. After narrowly surviving the horrific onslaught in Raccoon City, Claire Redfield now seeks clues in search of her missing brother, Chris. Join Claire as she uncovers the insidious activities of the Umbrella Corporation. Avoid or eliminate flesh-eating zombies and horrific beasts. Use a variety weapons, items, and clues scattered around Raccoon City to help you survive the nightmare and make sure the virus doesn't spread any farther.
Top
Action
Horror
Survival
Top
Action
Horror
Survival
63 569
395
Silent Hill 3
Silent Hill 3Silent Hill 3 is the third installment in the Silent Hill series. Like the previous entries, Silent Hill 3 is a survival horror combining action-based combat and puzzle-solving, but is somewhat more combat-oriented than the preceding installments. The main character is able to side-step and block some attacks, but in general shares with the other protagonists of the series their relative ineptitude in combat.
Top
Action
Horror
Science fiction
Stealth
Survival
Mystery
Top
Action
Horror
Science fiction
Stealth
Survival
Mystery
53 808
168
Fable II
Fable IIFable 2 is the second game in the fable series by Lionhead Studios, it is an open world role-playing game. It has a simple story line where the hero needs to save Albion from the evil Lord Lucian by collecting together the other three heroes to defeat him. Interactive cut-scenes are a large part of the game however the main character never speaks and all dialogue is uncontrolled. The game features a large variety of game play and freedom, allowing a player to shape the world around and the characters appearance and moral standing based on decisions throughout the game. The player can also get married both same and opposite sex and bring up children to childhood but no farther, expressions are a lot more interactive with NPC's than before
Top
Open world
Action
Fantasy
Top
Open world
Action
Fantasy
47 706
131